Technical Planning for a Solar Power Plant – Steps Toward a Turnkey PV Plant

The technical planning of solar power plants is always be done to achieve optimal yields. The choice of high quality components, that correspond to the geographic conditions, plays a decisive role in this process.

To secure the planning, a facility planner must visit the site before tendering. With these and the technical documents obtained, a PV plant can be planned, ensuring optimum return and durability. After the technical design and the choice of components are completed, the turnkey offer is calculated.

Having received the order, the project managers start planning the construction of the solar power plant. This includes the detailed plans of interconnections, coordination of the contractual arrangements with the trades, taking out licenses (building permit, feed-in commitment), scheduling delivery dates, and other tasks. During the construction period, a site manager supervises the progress of the work on site and ensures a professional execution.

The Technical Takeover (TTO) of the PV plant by external experts and the documentation complete the project before it is handed over to the technical plant operation and, ready for immediate operation, to the customer at last.
image technical planning